x

Like our Facebook Page

   
Early Times Newspaper Jammu, Leading Newspaper Jammu
 
Breaking News :   Low voter turnout in urban areas worries BJP leaders | After Mehbooba’s Poonch tour, BJP to devise fresh strategy | Ramban: Over 500 persons relocated to safer places amid land sinking | ‘Rebuild our shattered lives’ | Those who turned down Ram temple invitation will be rejected by voters: PM Modi | Will support like-minded parties in Kashmir: Ravinder Raina | 3 accused arrested within hours, case solved: Police | VDG killed in Udhampur gunfight | More rain in Kashmir till April 30: MeT | Property used as shelter by terrorists attached | BRO rescues people stuck at Razdan Pass | NTA to announce details of exam centers | Annual Foundation Day celebrated | Interaction-Cum-Workshop held | BJP exploited public sentiments: Javed Rana | Higher Edu Deptt, IITs offering Internship, Sponsor M. Tech. Program Opportunity for Students from Ladakh for 2024 | 27th Annual Bhandra organized at Vaishno Mandir Bhagwati Nagar | Grand celebration marks 101st Birth Anniversary of Veer Ram Chander Ji | Man arrested with narcotics material on Rajouri highway | Preserving Water Bodies | Ajaz Jan urges maximum participation in LS Polls to safeguard our distinctive identity | VDGs playing vital role in containing terrorism in J&K: Kavinder | JKNC Student Wing convenes meeting, advocates for youth empowerment | 4 killed, 2 missing in road accident in Ganderbal | BJP Govt failed to fulfill promises made with KP migrants: Rattan Lal Gupta | Cardiovascular health in developing world - Multifactorial and intersectoral determinants: Dr Sushil Sharma | Interaction between ADGP Armed J&K and JKP MRT held | Mehbooba appeals ECI not to defer elections in Anantnag-Rajouri LS seat | Back Issues  
 
news details
ISRO successfully commences testing of semi-Cryogenic Engine
5/11/2023 10:03:12 PM
agencies
BENGALURU, May 11: The Indian Space Research Organisation has sucessfully commenced testing of its semi-cryogenic engines that would power future launch vehicles.
The very first integrated test on an intermediate configuration of the 2000 kN (Kilonewton) semi-cryogenic engine carried out at the newly-commissioned Semicryogenic Integrated Engine & Stage Test facility at ISRO Propulsion Complex (IPRC) at Mahendragiri in Tamil Nadu on Wednesday was successful, the Bengaluru-headquartered national space agency said.
The test is a step towards developing a 2000 kN thrust engine, which works on Liquid Oxygen (LOX)-Kerosene propellant combination, for future launch vehicles, an ISRO statement said.
ISRO commences testing its Semi-cryogenic engines.
The very first test conducted on May 10, 2023, at IPRC, Mahendragiri, is successful.
The intermediate configuration, designated as Power Head Test Article (PHTA), comprises all the engine systems except the thrust chamber.
It was the first of a series of tests planned to validate the design of the propellant feed system, including the low-pressure and high-pressure turbo-pumps, the gas generator, and control components.
The Liquid Propulsion Systems Centre (LPSC) of ISRO has undertaken the design & development of a semi-cryogenic engine with 2000 kN thrust with Indian industry participation, and it will power the booster stages of future launch vehicles.
Wednesday's test is a major milestone before integrating the complete engine and its qualification, ISRO said.
This test demonstrated the complex chill-down operations spanning about 15 hours duration that was conducted successfully, meeting all the required conditions for engine start. After the chill down of the LOX circuit, the feed circuit of kerosene was filled, and LOX was admitted into the gas generator by opening the injection valve. Successful performance of the test article helps derive the sequence of operations for further tests," it said.
The new facility at IPRC with a state-of-the-art Programmable Logic Controllers-based control system and data acquisition system, is capable of testing semi-cryogenic engines up to 2600 kN thrust and will support the subsequent testing and qualification of the fully integrated semi-cryogenic engine and stage, ISRO said.
This test, the space agency said, has demonstrated the successful performance of the test facility and PHTA in the first attempt itself.
According to ISRO, the Semi Cryogenic Propulsion System Project envisages the design and development of a 2000 kN semi-cryogenic engine and 'SC120 stage' that will enable the development of a heavy-lift capability for future Indian space transportation systems.
  Share This News with Your Friends on Social Network  
  Comment on this Story  
 
 
 
Early Times Android App
STOCK UPDATE
  
BSE Sensex
NSE Nifty
 
CRICKET UPDATE
 
 
 
 
 
 
 
 
   
Home About Us Top Stories Local News National News Sports News Opinion Editorial ET Cetra Advertise with Us ET E-paper
 
 
J&K RELATED WEBSITES
J&K Govt. Official website
Jammu Kashmir Tourism
JKTDC
Mata Vaishnodevi Shrine Board
Shri Amarnath Ji Shrine Board
Shri Shiv Khori Shrine Board
UTILITY
Train Enquiry
IRCTC
Matavaishnodevi
BSNL
Jammu Kashmir Bank
State Bank of India
PUBLIC INTEREST
Passport Department
Income Tax Department
JK CAMPA
JK GAD
IT Education
Web Site Design Services
EDUCATION
Jammu University
Jammu University Results
JKBOSE
Kashmir University
IGNOU Jammu Center
SMVDU