x

Like our Facebook Page

   
Early Times Newspaper Jammu, Leading Newspaper Jammu
 
Breaking News :   Rs 500 crore needed to become Cong’s CM face, alleges Sidhu’s wife | Connectivity, coordination ensured historic success: Defence Minister | Singh dedicates BRO’s 22 vital infrastructure projects for J&K | Fight against Chitta: Rare political unity in Himachal sends message to J&K | Srinagar Police seize Rs 1 crore property of notorious drug peddler | 25 killed, 6 injured in fire at nightclub in Goa | Deeply saddened: LG Sinha | LG Sinha extends gratitude to soldiers, urges people to donate generously | JKPSC conducts CCE as per schedule | JKPSC conducts CCE as per schedule | CBK files chargesheet, 2 booked | Parliamentary Panel to summon airline executives, regulator | PM Modi to initiate debate on Vande Mataram in Lok Sabha today | Cross-border arms smuggling module busted in Punjab | MeT predicts light snowfall | Forest fire triggers landmine blasts | MLA Ramgarh kick-starts lane & drain Development work at village Dabuj Kaka | Three of family killed as car overturns in Karnataka’s Mandya | Kendriya Vidyalaya Samba celebrated its Annual Sports Day with great zeal, enthusiasm | Natrang stages play Topian | CM Yogi Adityanath government intensifies crackdown on illegal liquor networks to safeguard public safety | JNV Budgam hosts Grand ‘Alumni Meet 2025’ | Under Chief Minister Yogi Adityanath’s leadership, Uttar Pradesh has emerged as the new powerhouse of Startup India | Armed Forces Flag Day: Div Com Kashmir pays homage to Armed forces | Uttarakhand: Interstate arms trafficker held with 5 guns, 40 cartridges | Self-employment is creating most new jobs in India: What this means for job seekers in the years to come | Manipulation in Campus Placements: IITs Ignite a needed ethical revolution | INDIA Bloc On Crossroads | Back Issues  
 
news details
ISRO successfully commences testing of semi-Cryogenic Engine
5/11/2023 10:03:12 PM
agencies
BENGALURU, May 11: The Indian Space Research Organisation has sucessfully commenced testing of its semi-cryogenic engines that would power future launch vehicles.
The very first integrated test on an intermediate configuration of the 2000 kN (Kilonewton) semi-cryogenic engine carried out at the newly-commissioned Semicryogenic Integrated Engine & Stage Test facility at ISRO Propulsion Complex (IPRC) at Mahendragiri in Tamil Nadu on Wednesday was successful, the Bengaluru-headquartered national space agency said.
The test is a step towards developing a 2000 kN thrust engine, which works on Liquid Oxygen (LOX)-Kerosene propellant combination, for future launch vehicles, an ISRO statement said.
ISRO commences testing its Semi-cryogenic engines.
The very first test conducted on May 10, 2023, at IPRC, Mahendragiri, is successful.
The intermediate configuration, designated as Power Head Test Article (PHTA), comprises all the engine systems except the thrust chamber.
It was the first of a series of tests planned to validate the design of the propellant feed system, including the low-pressure and high-pressure turbo-pumps, the gas generator, and control components.
The Liquid Propulsion Systems Centre (LPSC) of ISRO has undertaken the design & development of a semi-cryogenic engine with 2000 kN thrust with Indian industry participation, and it will power the booster stages of future launch vehicles.
Wednesday's test is a major milestone before integrating the complete engine and its qualification, ISRO said.
This test demonstrated the complex chill-down operations spanning about 15 hours duration that was conducted successfully, meeting all the required conditions for engine start. After the chill down of the LOX circuit, the feed circuit of kerosene was filled, and LOX was admitted into the gas generator by opening the injection valve. Successful performance of the test article helps derive the sequence of operations for further tests," it said.
The new facility at IPRC with a state-of-the-art Programmable Logic Controllers-based control system and data acquisition system, is capable of testing semi-cryogenic engines up to 2600 kN thrust and will support the subsequent testing and qualification of the fully integrated semi-cryogenic engine and stage, ISRO said.
This test, the space agency said, has demonstrated the successful performance of the test facility and PHTA in the first attempt itself.
According to ISRO, the Semi Cryogenic Propulsion System Project envisages the design and development of a 2000 kN semi-cryogenic engine and 'SC120 stage' that will enable the development of a heavy-lift capability for future Indian space transportation systems.
  Share This News with Your Friends on Social Network  
  Comment on this Story  
 
 
 
Early Times Android App
STOCK UPDATE
 
 
 
 
 
 
 
   
Home About Us Top Stories Local News National News Sports News Opinion Editorial ET Cetra Advertise with Us ET E-paper
 
 
J&K RELATED WEBSITES
J&K Govt. Official website
Jammu Kashmir Tourism
JKTDC
Mata Vaishnodevi Shrine Board
Shri Amarnath Ji Shrine Board
Shri Shiv Khori Shrine Board
UTILITY
Train Enquiry
IRCTC
Matavaishnodevi
BSNL
Jammu Kashmir Bank
State Bank of India
PUBLIC INTEREST
Passport Department
Income Tax Department
JK CAMPA
JK GAD
IT Education
Web Site Design Services
EDUCATION
Jammu University
Jammu University Results
JKBOSE
Kashmir University
IGNOU Jammu Center
SMVDU