x

Like our Facebook Page

   
Early Times Newspaper Jammu, Leading Newspaper Jammu
 
Breaking News :   Low voter turnout in urban areas worries BJP leaders | After Mehbooba’s Poonch tour, BJP to devise fresh strategy | Ramban: Over 500 persons relocated to safer places amid land sinking | ‘Rebuild our shattered lives’ | Those who turned down Ram temple invitation will be rejected by voters: PM Modi | Will support like-minded parties in Kashmir: Ravinder Raina | 3 accused arrested within hours, case solved: Police | VDG killed in Udhampur gunfight | More rain in Kashmir till April 30: MeT | Property used as shelter by terrorists attached | BRO rescues people stuck at Razdan Pass | NTA to announce details of exam centers | Annual Foundation Day celebrated | Interaction-Cum-Workshop held | BJP exploited public sentiments: Javed Rana | Higher Edu Deptt, IITs offering Internship, Sponsor M. Tech. Program Opportunity for Students from Ladakh for 2024 | 27th Annual Bhandra organized at Vaishno Mandir Bhagwati Nagar | Grand celebration marks 101st Birth Anniversary of Veer Ram Chander Ji | Man arrested with narcotics material on Rajouri highway | Preserving Water Bodies | Ajaz Jan urges maximum participation in LS Polls to safeguard our distinctive identity | VDGs playing vital role in containing terrorism in J&K: Kavinder | JKNC Student Wing convenes meeting, advocates for youth empowerment | 4 killed, 2 missing in road accident in Ganderbal | BJP Govt failed to fulfill promises made with KP migrants: Rattan Lal Gupta | Cardiovascular health in developing world - Multifactorial and intersectoral determinants: Dr Sushil Sharma | Interaction between ADGP Armed J&K and JKP MRT held | Mehbooba appeals ECI not to defer elections in Anantnag-Rajouri LS seat | Back Issues  
 
news details
ISRO develops light-weight, innovative nozzle for rocket engines, terms it 'breakthrough'
4/16/2024 10:07:40 PM
Agencies
BENGALURU, Apr 16: ISRO said it has achieved a breakthrough in rocket engine technology with the development of a lightweight Carbon-Carbon (C-C) nozzle for rocket engines, enhancing payload capacity.
This innovation accomplished by the space agency's Vikram Sarabhai Space Centre (VSSC) promises to enhance the vital parameters of rocket engines, including thrust levels, specific impulse, and thrust-to-weight ratios, thereby boosting the payload capacity of launch vehicles, it said. Thiruvananthapuram-based VSSC leveraged advanced materials like Carbon-Carbon (C-C) composites to create a nozzle divergent that offers exceptional properties, an ISRO statement said.
By utilising processes such as carbonisation of green composites, chemical vapor Infiltration, and high-temperature treatment, it has produced a nozzle with low density, high specific strength, and excellent stiffness, capable of retaining mechanical properties even at elevated temperatures, it said. A key feature of the C-C nozzle is its special anti-oxidation coating of silicon carbide, which extends its operational limits in oxidising environments.
This innovation not only reduces thermally induced stresses but also enhances corrosion resistance, allowing for extended operational temperature limits in hostile environments, according to ISRO. The potential impact of this development is significant, particularly for the ISRO's workhorse launcher, the Polar Satellite Launch Vehicle (PSLV). The PS4, the fourth stage of the PSLV, currently employs twin engines with nozzles made from columbium alloy.
However, by replacing these metallic divergent nozzles with C-C counterparts, a mass reduction of approximately 67 per cent can be achieved, the space agency said. This substitution is projected to increase the payload capability of the PSLV by 15 kg, a notable enhancement for space missions. The successful testing of the C-C nozzle divergent marked a major milestone for ISRO.
On March 19, 2024, a 60-second hot test was conducted at the High-Altitude Test (HAT) facility in ISRO Propulsion Complex (IPRC), Mahendragiri in Tamil Nadu, confirming the system's performance and hardware integrity. "Subsequent tests, including a 200-second hot test on April 2, 2024, further validated the nozzle's capabilities, with temperatures reaching 1216 K, matching predictions," the release said. The collaborative effort involved the Liquid Propulsion Systems Centre (LPSC) at Valiamala near Thiruvananthapuram which designed and configured the test, and IPRC, which conducted the instrumentation and execution of the tests at its HAT facility, it was noted.
  Share This News with Your Friends on Social Network  
  Comment on this Story  
 
 
 
Early Times Android App
STOCK UPDATE
  
BSE Sensex
NSE Nifty
 
CRICKET UPDATE
 
 
 
 
 
 
 
 
   
Home About Us Top Stories Local News National News Sports News Opinion Editorial ET Cetra Advertise with Us ET E-paper
 
 
J&K RELATED WEBSITES
J&K Govt. Official website
Jammu Kashmir Tourism
JKTDC
Mata Vaishnodevi Shrine Board
Shri Amarnath Ji Shrine Board
Shri Shiv Khori Shrine Board
UTILITY
Train Enquiry
IRCTC
Matavaishnodevi
BSNL
Jammu Kashmir Bank
State Bank of India
PUBLIC INTEREST
Passport Department
Income Tax Department
JK CAMPA
JK GAD
IT Education
Web Site Design Services
EDUCATION
Jammu University
Jammu University Results
JKBOSE
Kashmir University
IGNOU Jammu Center
SMVDU