x

Like our Facebook Page

   
Early Times Newspaper Jammu, Leading Newspaper Jammu
 
Breaking News :   Div Com inspects protection works on Ravi River embankment at Lakhanpur | Ajaz Jan participates in Eid-Milad-un-Nabi procession at Poonch | J&K Bank holds customer meet in Delhi | Khatana hails Next-Gen GST reforms | MLA Arvind Gupta organizes free medical camp in Ward 31 | LMD imposes Rs 1.31 lakh penalty on erring traders | CM Omar Abdullah visits Kulgam | Gupta led NC delegation participated in Eid-e-Milad Procession at Dansal | JMC issues comprehensive health advisory amid post-flood challenges | Notorious bovine smuggler booked under PSA by Police | 4.26 grams heroine like substance recovered two drug peddlers arrested | Air warriors trained for Disaster Management | Two held in Delhi for duping businessman of Rs 2.15 lakh in loan scam | As waterlogging persists post-floods, fear of Dengue outbreak grips Jammu | Life-term awarded to duo for murder | Jmu–Sgr National Highway remains shut | Jhelum water level rises to 630 Cumecs in Uri | CM Omar visits flood-hit areas of Anantnag, assures relief, flood mitigation measures | IAF, Udhampur Admin airlift 2 critical patients | MeT predicts light rains, no major activity till Sept 12 | Amid stalled talks with Centre, Ladakh leaders turn to Thupstan Chhewang | PM Modi won’t address general debate at UNGA session | Searches launched in Samba | ‘Op Sindoor’ shining testament to India's unparalleled prowess: Air Chief Marshal Singh | GST overhaul people’s reform: FM Sitharaman | Punjab Flood Tragedy | “Teachers lighting the Path: The Architect of Character” | PM Modi's "Healthy India" vision gaining strength in J&K: Balbir | Youth from J&K witness passing out parade at OTA Chennai | Maa Ko Gaali Bihar Par Bari | Eid Milad-un-Nabi observed with religious fervor in Poonch | MIER College of Education organises workshop on Novel Methods of Assessment | DDC Vice-Chairperson reviews relief, Rehabilitation efforts at landslide hit Sundla village, other parts of Majalta | DC inspects pace of restoration work on Kishtwar-Thathri stretch of NH-244 | Transport Deptt to steer UP towards development: CM Yogi | Eid Milad-un-Nabi observed with religious fervor in Poonch | KVK Reasi Trains Rural Women on Agri-entrepreneurship | SDM Gool conducts on-site assessment of damages | Doda Police Prevents Suicide Attempt, Rescues Woman, Two Children | Bakshi's All-Round Brilliance helps JU XI beat Media XI by 19 Runs in a friendly Tie | Yogi Govt set to make UP global leader in agriculture by 2047 | Ganesh Visarjan celebrated with religious fervor in Poonch | Two-week Student Induction Program for new entrants begins at SMVDU | Flag-off ceremony of Ladakh Senior Girls Football Team held | Eight LPU students join 300+ international scholars at fully funded programs in Russia | DBU Enters into MoU with HNE Health Care to Promote Research and Development | Back Issues  
 
news details
J&K has 18000 MW estimated hydro power potential: Javed Rana
3/22/2025 10:01:27 PM
Early Times Report
JAMMU, Mar 22: Minister for Jal Shakti, Javed Ahmad Rana, said that J&K has an estimated hydro power potential of 18,000 MegaWatt (MW), of which, 14867 MW has been identified.
The Minister was replying on behalf of the Chief Minister to a question raised by Mubarak Gul.
The Minister informed the House that the identified potential comprises 11283 MW in Chenab basin, 3084 MW in Jhelum basin and 500 MW in Ravi basin. He said that out of the identified potential, 3540.15 MW (23.81%) has been harnessed till date including 1197.4 MW in UT sector (JKSPDC), 2250 MW in Central sector (NHPC) and 92.75 MW in IPP mode under 31 projects.
Regarding the Solar Power Projects, the Minister said that solar power plants with capacity of 41367 and 34300 have been installed in a total of 4648 government buildings and 5463 residential households respectively.
The Minister said that UT of J&K has an estimated solar potential of 111 GW, most of which is restricted to the UT of Ladakh. He added that the mega size solar power projects have not been developed in J&K till date as identification of feasible land banks (500 acres for 100 MW solar park) at a single location for its development is difficult because of the topography of the UT.
The Minister informed that, however, a cumulative capacity of 75 MW of Rooftop Solar Power Plants has been installed in the UT of J&K across all sectors under various schemes and projects mostly sponsored by the Ministry of New and Renewable Energy (MNRE), GoI.
He added that, presently, the Rooftop Solar Power plants are being installed on residential households by DISCOMS under PM Surya Ghar Muft Bijli Yojna in which 1 kWp Rs 55,000 with subsidy of Rs 36,000, 2 kWp Rs 1,10,000 with subsidy of Rs 72,000 and 3 kWp Rs 1,59,500 with subsidy of Rs 94,800 have been finalized.
The Minister also informed that Purchase of electric/utility poles, HT/LT wires and transformers is being made through the Procurement wing.
  Share This News with Your Friends on Social Network  
  Comment on this Story  
 
 
 
Early Times Android App
STOCK UPDATE
  
BSE Sensex
NSE Nifty
 
CRICKET UPDATE
 
 
 
 
 
 
 
 
   
Home About Us Top Stories Local News National News Sports News Opinion Editorial ET Cetra Advertise with Us ET E-paper
 
 
J&K RELATED WEBSITES
J&K Govt. Official website
Jammu Kashmir Tourism
JKTDC
Mata Vaishnodevi Shrine Board
Shri Amarnath Ji Shrine Board
Shri Shiv Khori Shrine Board
UTILITY
Train Enquiry
IRCTC
Matavaishnodevi
BSNL
Jammu Kashmir Bank
State Bank of India
PUBLIC INTEREST
Passport Department
Income Tax Department
JK CAMPA
JK GAD
IT Education
Web Site Design Services
EDUCATION
Jammu University
Jammu University Results
JKBOSE
Kashmir University
IGNOU Jammu Center
SMVDU