x

Like our Facebook Page

   
Early Times Newspaper Jammu, Leading Newspaper Jammu
 
Breaking News :   Poonch bears maximum brunt of Pak shelling | CM Omar visits shelling hit Uri | Airspace to Cyberspace: How India fought swarms of drones, wave of misinformation during conflict | IAF jammed Pak’s Chinese-supplied air defence systems | CDS, tri-service Chiefs brief Prez Murmu | CDS, Army, Navy, Air Chiefs, shed light on successful conduct of operation | CM slams Sardesai: ‘Which Indian won’t support PM’s anti-terror doctrine?’ – Netizens applaud Omar Abdullah | 3 killed Lashkar terrorists behind recent terror activities: Army | Pak hands over BSF Jawan to India after 21 days | Article 370, Rape, Bulldozer Justice: India’s new CJI Justice has delivered many landmark verdicts | Tanker crushes court official to death | Schools reopen in border Distts | Govt amends Prison Manual | Bridging The Gap | Shelling by Pakistan on civilians is highly condemnable : Sadhotra | Div Com, Kashmir reviews Mata Kheer Bhawani Mela arrangements through video conferencing | Northern Army Commander briefs CM Omar on security situation | Helicopter service resumes after 7 days | Kathua police attach property worth Rs 19 lakh of notorious drug peddler | Jammu Municipal Corporation takes action against unregistered dairies | Inqlabi demands relief for shelling victims, FIR against MP minister for derogatory remarks | Rana advocates mandatory bunkers in border areas to protect lives | NFR leveraging modern technology for ensuring safety of Lumding - Badarpur Hill Section | CM Yogi orders maximum vigilance in zoos to avert bird flu threat | Aerial right for transmission lines remains with the State: HC | Gold declines Rs 650 to Rs 96,850/10 Gm amid weak global cues | Notorious drug peddler held in Udhampur, heroin seized | Mission Director Sandeep Kumar reviews progress of key projects under HADP | BLSKS presented 495th musical play “Ekta - Ekta Ka Diya” | Operation Sindoor: A wake-up call for Pakistan: Rohiin Chandan | Two held in Bishnah assault case, sharp weapons recovered by Jammu police | IGNOU to open online portal for re-registration for July 2025 session | Govt appoints 122 Junior Assistants to address clerical staff shortage in RDD | JSSJ Soars High with Stellar CBSE Class 10 & 12 Board Results | SMVDU faculty present research paper in international conference | Dogra Degree College launches "Rashtra Pratham - Nation First" campaign | Back Issues  
 
news details
India’s Chandrayaan-3 mission to be launched on July 14
7/6/2023 10:41:19 PM

Agencies

Bengaluru, July 6: The Indian Space Research Organisation (ISRO) on Thursday announced that its lunar mission Chandrayaan-3 will be launched on July 14 from the space port at Sriharikota in Andhra Pradesh. ISRO Chairman Somanath S said attempt to soft-land the mission on Moon will be made on August 23 or August 24.
ISRO’s new heavylift launch vehicle LVM-3 will carry out the Moon mission. “Announcing the launch of Chandrayaan-3: LVM3-M4/Chandrayaan-3 Mission: The launch is now scheduled for July 14, 2023, at 2:35 pm IST from SDSC (Satish Dhawan Space Centre), Sriharikota,” ISRO tweeted.
The Chandrayaan-3 mission carries scientific instruments to study the thermophysical properties of the lunar regolith, lunar seismicity, lunar surface plasma environment and elemental composition in the vicinity of the landing site.
While the scope of these scientific instruments on the lander and the rover would fit in the theme of “Science of the Moon”, another experimental instrument will study the spectro-polarimetric signatures of the Earth from the lunar orbit, which would fit in the theme of “Science from the Moon”, according to ISRO officials.
In March this year, the Chandrayaan-3 spacecraft successfully completed the essential tests that validated its capability to withstand the harsh vibration and acoustic environment that the spacecraft would encounter during its launch.
These tests were particularly challenging, considering the fact that the Chandrayaan-3 spacecraft, which will be launched by LVM3 (Launch Vehicle Mark-III) (earlier referred to as GSLV Mk III), is a composite of three modules—propulsion, lander and rover.
The propulsion module, which has Spectro-polarimetry of Habitable Planet Earth (SHAPE) payload to study the spectral and polarimetric measurements of Earth from the lunar orbit, will carry the lander and rover configuration till 100 km of the lunar orbit.
The lander payloads are: ‘Chandra’s Surface Thermophysical Experiment’ to measure the thermal conductivity and temperature; ‘Instrument for Lunar Seismic Activity’ for measuring the seismicity around the landing site; and ‘Langmuir Probe’ to estimate the plasma density and its variations.
A passive Laser Retroreflector Array from US space agency National Aeronautics and Space Administration (NASA) is also accommodated for lunar laser ranging studies.
  Share This News with Your Friends on Social Network  
  Comment on this Story  
 
 
 
Early Times Android App
STOCK UPDATE
  
BSE Sensex
NSE Nifty
 
CRICKET UPDATE
 
 
 
 
 
 
 
 
   
Home About Us Top Stories Local News National News Sports News Opinion Editorial ET Cetra Advertise with Us ET E-paper
 
 
J&K RELATED WEBSITES
J&K Govt. Official website
Jammu Kashmir Tourism
JKTDC
Mata Vaishnodevi Shrine Board
Shri Amarnath Ji Shrine Board
Shri Shiv Khori Shrine Board
UTILITY
Train Enquiry
IRCTC
Matavaishnodevi
BSNL
Jammu Kashmir Bank
State Bank of India
PUBLIC INTEREST
Passport Department
Income Tax Department
JK CAMPA
JK GAD
IT Education
Web Site Design Services
EDUCATION
Jammu University
Jammu University Results
JKBOSE
Kashmir University
IGNOU Jammu Center
SMVDU