x

Like our Facebook Page

   
Early Times Newspaper Jammu, Leading Newspaper Jammu
 
Breaking News :   Justice For Terror Victim Families | Kathua Administration welcomes first Batch of Amarnath Yatris at Lakhanpur | Yatra of resilience: LG to flag off first batch today after Pahalgam carnage, Op Sindoor | LG visits Yatri Niwas at Bhagwati Nagar, reviews arrangements | LG reviews final preparations | LG chairs high-level meeting, discusses issues of terror victim families | LG flags off fleet of ambulances in Ramban, Anantnag districts | 5 real brothers from Budgam among fraudulently selected candidates | Hope beneath the surface: Govt plans underground hospital in Poonch | ACB catches DDC member red handed | Crime Branch books J&K Bank officers, others for frauds | Back Issues  
 
news details
Opens India’s longest rail tunnel
2/20/2024 10:56:47 PM
Early Times Report

SRINAGAR, Feb 20: The longest railway tunnel of the country on the Udhampur-Srinagar-Baramulla Rail Link (USBRL) was opened by Prime Minister Narendra Modi on Monday as he flagged off the first electrified trains of the Kashmir valley.
“Prime Minister Modi was present in Jammu and he virtually flagged off two electrified trains simultaneously one from Srinagar to Sangaldan in the down direction and the other from Sangaldan to Srinagar in the up direction,” a railway official said.
He added that the prime minister also inaugurated the 48.1-km-long Banihal-Khari-Sumber-Sangaldan section. “This longest tunnel, which is 12.77-km long and known as T-50, falls between the Khari-Sumber section,” the official said.
History is set to be created with the inaugural run of DEMU train from Sangaldan to Baramulla from the decked-up Sangaldan station in Jammu and Kashmir.#RailInfra4JammuandKashmir pic.twitter.com/jB2GIVXrbl
Ministry of Railways (@RailMinIndia) February 20, 2024
According to the Northern Railway (NR), trains can now run from Baramulla to Sangaldan via Banihal, which used to be the last or originating station earlier.
T-50 is supposed to be the most challenging of the 11 tunnels in the Banihal-Khari-Sumber-Sangadal section.
According to railway officials associated with the project, the tunnel work started around 2010 and it took almost 14 years to operationalise it.
“All safety measures have been taken inside the tunnel to meet emergency situations. An escape tunnel has been constructed parallel to T-50 to evacuate passengers in case of any emergency,” an official said.
“At every 375 metres, a connecting passage between the escape tunnel and T-50 has been made so that the passengers can be brought to the escape tunnel and then, carried to their desired destinations in vehicles,” he added.
The official said that in order to tackle a fire incident, water pipes have been laid on both sides of the tunnel with an opening valve provided at every 375 metres so that water can be sprayed on a train from both sides to douse the flames.
“Escape tunnels have been created for other bigger tunnels too,” he said.
According to NR officials, the opening up of the Banihal-Khari-Sumber-Sangaldan section has brought them a step closer to achieving the dream of running a train from the Kasmir valley in the north to Kanyakumari on the southern tip of the country.
“Earlier, eight diesel trains (four each from one side) were operating between Baramulla and Banihal. Today, Prime Minister Modi not only inaugurated the extension of the Banihal route to Sangaldan via Khari and Samber, but also flagged off the first electrified trains on the whole route from Baramulla to Sangaldan,” the official said.
Now, eight electrified trains have started running between Baramulla and Banihal and four of those have been extended to Sangaldan.
“The four other trains will also be extended up to Sangaldan after a couple of months,” the official added.
According to experts associated with the project, the first section of the USBRL— the Quazigund-Baramulla section was operationalised by the Congress-led United Progressive Alliance (UPA) government in 2009. In July 2013, the Banihal-Quazigund section, which included the operationalisation of the 11.2-km-long T-80 Pir Panjal tunnel, was opened.
“Once the complete USBRL opens in the coming months, passengers will enjoy infrastructural marvels, such as the Chenab bridge, the highest railway bridge in the world, and the Anji bridge, which is the first cable-stayed bridge of the Indian Railways,” an NR official said, adding that the total length of the USBRL is 272 km and the cost of the project is Rs 41,119 crore.
  Share This News with Your Friends on Social Network  
  Comment on this Story  
 
 
 
Early Times Android App
STOCK UPDATE
  
BSE Sensex
NSE Nifty
 
CRICKET UPDATE
 
 
 
 
 
 
 
 
   
Home About Us Top Stories Local News National News Sports News Opinion Editorial ET Cetra Advertise with Us ET E-paper
 
 
J&K RELATED WEBSITES
J&K Govt. Official website
Jammu Kashmir Tourism
JKTDC
Mata Vaishnodevi Shrine Board
Shri Amarnath Ji Shrine Board
Shri Shiv Khori Shrine Board
UTILITY
Train Enquiry
IRCTC
Matavaishnodevi
BSNL
Jammu Kashmir Bank
State Bank of India
PUBLIC INTEREST
Passport Department
Income Tax Department
JK CAMPA
JK GAD
IT Education
Web Site Design Services
EDUCATION
Jammu University
Jammu University Results
JKBOSE
Kashmir University
IGNOU Jammu Center
SMVDU