Early Times Report JAMMU, Oct 19: In order to carry out work of PCC pole erection and installation of HT/LT cable by M/S. IRCON under R-APDRP scheme, the power supply to Paloura Soap factory and its adjoining areas shall remain affected on October 20 to 22 from 09 am to 02 pm. Similarly, the power supply to BSF Paloura, Subash Nagar, Priya Darshani Lane, Bakshi Enclave and adjoining areas shall remain affected on October 20 from 08 am to 10 am. Meanwhile, the power supply to Upper Roop Nagar, Buta Nagar, Shiva Enclave, Muthi PHE and Top Paloura areas shall remain affected on October 20 and 22 from 10 am to 01 pm. Similarly, the power supply to Lower Roop Nagar, Laxmi Nagar, Upper Muthi, Lower Muthi, Roop Nagar, Dream City, Barnai, Neetar Kothian, Patoli, Paloura, BSF Camp, Army Brigade, PHE Muthi, Doordarshan and adjoining areas shall remain affected on October 21 from 10 am to 11.30 am. |