Early Times Report JAMMU, Apr 17: In order to carry out balance work of erection of 132 KV Beam structures to facilitate DC Railway traction work at 132/66 KV Grid Station Samba and other allied works, the shut down of 2x50 MVA, 132/66 KV Grid Station Samba is allowed on 19.4.2915 from 9 am to 1 pm. As intimated by Chief Engineer, S&O Wing Jammu during the shut down period the power supply to Samba town, Industrial area, Bari-Brahmana, Ghagwal, Vijaypur and their adjoining areas and industries shall be affected. However, the power supply to Grid Station Bari-Brahmana-II shall be met from Gladni Grid Station during the shut down period. |